The Panda Nut
Nutty about Pandas Infected by Panda virus and OPD
I was back on house wiring for a few hours earlier and I feel I've broken the back of this job. I am removing pretty well all thats left and the doing the rest (basically kitchen from scratch as the last coner is over the kitchen. I also have the garage to reconnect and rewire and the outside lights. I have never seen such a mess in any of the many houses we have owned over the last 50 odd years. I will the need to arrange a building wiring safety check.
Today I removed between 10 and 20m of wire today that was entirely uneccessaryfrom just tow socket supplies. There is at least the same agin to come out tomorrow. I hope its good enough to re use as my spool of new wire has run out. though I may well just go get some more new wire and be done with it, I have some channels to cut into the walls to add a cable to close my new ring main and a couple of cables to get down inside the walls for the same reason. It may not be the very best in terms of tidiness, but all my cables are in use, all are properly and neatly routed and fixed and as far as I can tell all the new wirng is compliant with the regs. I have removed all corroded wiring and its now done in line with up to date standards with lights and ring mains now separate and everything done up to the correct torque. Its is without doubt better than it was although I have yet to attach the sockets and throw the switch. All wires are labelled and we have an accurate plant of where every wire runs. There will be 3 juntion boxes in the ring main down from somewhere like 10. Hopefully even at snails pace I shall be able to finish the loft insulation and get downstairs again. Basically where I thought I would be 4 months back. It will be nice when we have a loo back.
Now I need warm weather as I am running out of fire wood. The waste wood from this place has provided 90%of out heat this winter which really does make me smile.
Today I removed between 10 and 20m of wire today that was entirely uneccessaryfrom just tow socket supplies. There is at least the same agin to come out tomorrow. I hope its good enough to re use as my spool of new wire has run out. though I may well just go get some more new wire and be done with it, I have some channels to cut into the walls to add a cable to close my new ring main and a couple of cables to get down inside the walls for the same reason. It may not be the very best in terms of tidiness, but all my cables are in use, all are properly and neatly routed and fixed and as far as I can tell all the new wirng is compliant with the regs. I have removed all corroded wiring and its now done in line with up to date standards with lights and ring mains now separate and everything done up to the correct torque. Its is without doubt better than it was although I have yet to attach the sockets and throw the switch. All wires are labelled and we have an accurate plant of where every wire runs. There will be 3 juntion boxes in the ring main down from somewhere like 10. Hopefully even at snails pace I shall be able to finish the loft insulation and get downstairs again. Basically where I thought I would be 4 months back. It will be nice when we have a loo back.
Now I need warm weather as I am running out of fire wood. The waste wood from this place has provided 90%of out heat this winter which really does make me smile.
Last edited: