the amount my range has just dropped with the thrash ive just given bree![]()
eh?
the amount my range has just dropped with the thrash ive just given bree![]()
when i got back from work i was driving steadily and on about a 1/5 of a tank it displayed 220 miles....
after i drove to pick my sister up its now slightly into red.... and displaying 86 miles and the journeys 30 miles round trip![]()
hmm launch prices of leopard and vista ultimate.
leopard £80
vista ultimate £300+
i know which i prefer tbh
but i still not allowed posh friends round till halls and stairs are done![]()
forgot me other grump
took old carpet to dump A12 shut so all traffic cutting through town, dump is 10 miles away an it took 2 hours to get there an back. when i got there at 4.07pm it was shut, sign said they changed to winter opening times on the 15th october :bang:
my grump: good Glyn Hopkin dealers gone bad - they've been brill for the 8 weeksuntil the car turned up on Wednesday.. now they're so 'busy' and the admin lady's on holiday so I can't have Jack til next Tuesday.. they're caring attitude seems to have lapsed...
![]()
tell nick![]()
I look forward to my invite Dave
My grump - Quoted £1600 to fit and tile a kitchen?!?!![]()
If kitchen is average sort of size it sounds about right tbh
its as big as a postage stamp![]()
its as big as a postage stamp![]()
If kitchen is average sort of size it sounds about right tbh
Any electrical/plumbing work or is it a case of straight swapping units and tiling splashback?
weve got excel spreadhseetgh and **** here on how much we would of spent if we had payed people to do work on our house...
and how much its costing dad to do it![]()
You're not kidding 8 foot by 7 foot
It does not include electrical work, but does include fitting a sink.
The kitchen is empty and ready to go. Even some of the units have been put together ready.
Includes putting the floor down and tile splashback
![]()
You're not kidding 8 foot by 7 foot
It does not include electrical work, but does include fitting a sink.
The kitchen is empty and ready to go. Even some of the units have been put together ready.
Includes putting the floor down and tile splashback
![]()