premrajeev
New member
Well here are some pix of my quick rebuild.
Scheduled to complete in 15 days, work just started yesterday.
Processes planned :
1.Cylinder 3 oil seal change, head gasket change
2.Valve gap setting and correct timing.
3.Waterpump replacement (done)
4.chrome finishing of rocker cover
5.new spark plugs, oil and air filters
6.carburettor servicing
7.fuel tank and fuel line flushing & maintenance
8.Clutch liquid - change and line servicing
9.all brake pads & shoes : renew and bleed,adjust.
10.clutch/accelerator/brake pedal play adj.
11.Wheel balancing/alignment
12.Speedo - removal and refitting new one
13.bonnet opener cable change
14.new headlight units and clear indicator/side repeators
14.rear light cluster - renewal
15.new number plates
16.seats reconditioning and new foam/clothing
17.new sound system - all ready to fit
18.Front windshield-removal and replacing with new
19.replacing std steel rims with alloys
20.full respray with slight dark shade blue
21.welding, restproofing , waterproofing.
22.fitting of front fogs
23.fitting of auto security system w/central locking
24.electric front windows.
25.Possibily meshed grill
26.colour coded bumpers
27.front new bumper
28.seat belt - passenger side (u know why:bang: )
29.new side mirrors L/H &R/H
30.Stainless steel tailpipe for exhaust.
31.flushing and refilling the cooling system
32.refilling gas into the airconditioning system.
any item not listed will be included at a later stage,
here are some pix to start with.
Scheduled to complete in 15 days, work just started yesterday.
Processes planned :
1.Cylinder 3 oil seal change, head gasket change
2.Valve gap setting and correct timing.
3.Waterpump replacement (done)
4.chrome finishing of rocker cover
5.new spark plugs, oil and air filters
6.carburettor servicing
7.fuel tank and fuel line flushing & maintenance
8.Clutch liquid - change and line servicing
9.all brake pads & shoes : renew and bleed,adjust.
10.clutch/accelerator/brake pedal play adj.
11.Wheel balancing/alignment
12.Speedo - removal and refitting new one
13.bonnet opener cable change
14.new headlight units and clear indicator/side repeators
14.rear light cluster - renewal
15.new number plates
16.seats reconditioning and new foam/clothing
17.new sound system - all ready to fit
18.Front windshield-removal and replacing with new
19.replacing std steel rims with alloys
20.full respray with slight dark shade blue
21.welding, restproofing , waterproofing.
22.fitting of front fogs
23.fitting of auto security system w/central locking
24.electric front windows.
25.Possibily meshed grill
26.colour coded bumpers
27.front new bumper
28.seat belt - passenger side (u know why:bang: )
29.new side mirrors L/H &R/H
30.Stainless steel tailpipe for exhaust.
31.flushing and refilling the cooling system
32.refilling gas into the airconditioning system.
any item not listed will be included at a later stage,
here are some pix to start with.
Attachments
Last edited by a moderator: