Register Login
Mr FIAT - Your #1 source for vintage car parts
Mid Engined 2 Seater Italian sports (well...sporty) car?

In a Cinq....Hmmmm....
Old

A Bit of skirt....

Posted 23-02-2008 at 21:26 by arseofbox (arseofbox's Mad Cinq Build)

Ive finally got round to sorting out the Abarth skirts I bought at Stanford last year....

Been filling a damn big hole (with GRP!), and sanding it flat - the person I bought them off broke one slightly by getting airborne on the Isle of Man...

Theyre just about ready for priming then topcoating...I just need to get a sanding sponge, go over the tops again then prime and topcoat. I reckon they'll be fitted once I have the black Cinq to play with again.
Principality Retained :)
Views 1256 Comments 0 arseofbox is offline
Old

Work list...recomissioning RFJ

Posted 28-03-2007 at 18:38 by arseofbox (arseofbox's Mad Cinq Build)

The following needs doing.....

1. Reinstall front wiper linkage - as Uno motor is stripped atm.
2. Reinstall NSF Wishbone
3. Replace NSF Wheel bearing in spare upright
4. Reinstall spare upright to NSF position

5. Sort Rust in NSR arch
6. Replace Rear Drums, Shoes and Handbrake cable
7. Replace blown NSR tyre

Non Critical:

8. Renew Oil, Plugs and Filters all round
9. Get induction system machined and installed...
Principality Retained :)
Views 816 Comments 0 arseofbox is offline
Old

Work list...recomissioning RFJ

Posted 28-03-2007 at 18:36 by arseofbox (arseofbox's Mad Cinq Build)

The following needs doing.....

1. Reinstall front wiper linkage - as Uno motor is stripped atm.
2. Reinstall NSF Wishbone
3. Replace NSF Wheel bearing in spare upright
4. Reinstall spare upright to NSF position

5. Sort Rust in NSR arch
6. Replace Rear Drums, Shoes and Handbrake cable
7. Replace blown NSR tyre

Non Critical:

8. Renew Oil, Plugs and Filters all round
9. Get induction system machined and installed...
Principality Retained :)
Views 788 Comments 0 arseofbox is offline
Old

Work list...recomissioning RFJ

Posted 28-03-2007 at 18:35 by arseofbox (arseofbox's Mad Cinq Build)

The following needs doing

1. Reinstall front wiper linkage - as Uno motor is stripped atm.
2. Reinstall NSF Wishbone
3. Replace NSF Wheel bearing in spare upright
4. Reinstall spare upright to NSF position

5. Sort Rust in NSR arch
6. Replace Rear Drums, Shoes and Handbrake cable
7. Replace blown NSR tyre

Non Critical:

8. Renew Oil, Plugs and Filters all round
9. Get induction system machined and installed
Principality Retained :)
Views 809 Comments 0 arseofbox is offline
Old

Work list...recomissioning RFJ

Posted 28-03-2007 at 18:34 by arseofbox (arseofbox's Mad Cinq Build)

The following needs doing

1. Reinstall front wiper linkage - as Uno motor is stripped atm.
2. Reinstall NSF Wishbone
3. Replace NSF Wheel bearing in spare upright
4. Reinstall spare upright to NSF position

5. Sort Rust in NSR arch
6. Replace Rear Drums, Shoes and Handbrake cable
7. Replace blown NSR tyre

Non Critical:

8. Renew Oil, Plugs and Filters all round
9. Get induction system machined and installed
Principality Retained :)
Views 1361 Comments 5 arseofbox is offline